Project Application Details

ARCHIE Project title: 100
Project PI: HENRY DYER BUILDING 100 MONTROSE ST GLASGOW
Department: 21/02/2014
Address: HENRY DYER BUILDING, 100 MONTROSE ST GLASGOW, licensed software, G4 0LZ
Relevant industrial collaborations:
Existing relevant KTP activities:
Does the PI require to run calculations? 6
Number of users involved in the project: 3 Years
User 1 details:

Mr. Kurt Mizzi
PhD Student
Naval Architecture, Ocean and Marine Engineering
University of Strathclyde
kurt.mizzi@strath.ac.uk
00447564240230

User 2 details:

Mr. Yigit Demirel
PhD Student
Naval Architecture, Ocean and Marine Engineering
University of Strathclyde
yigit.demirel@strath.ac.uk
Phone: +44 (0)7588964191

Service level requested:
ARCHIE Project description: 100
Potential output of the project:

The intended output of this project is to complete a PhD study, produce a thesis and develop papers (Journal and Conference) in due course of the degree.

Project start date: 21/02/2014
Duration of the project: 3 Years
Total CPU time required (in hours): 300000
CPU hours required by typical job: 6
Approximate amount of data created per job (in GB):
Approximate amount of data created per project: 100
Funding Agency Grant Reference No:
pFact ID:
RKES ID:
Software required for the project: licensed software
Software required to be installed for the project: Star CCM+ (Already Installed)
Experience in using software package 1:
Software required to be installed for the project: Friendship-Framework: (https://www.friendship-systems.com/downloads/software)
Experience in using software package 2: 6
Software required to be installed for the project:
Experience in using software package 3: 1
Training required: Basic Linux, Basic of using HPC
Other training required:
Experience in using HPC: 1